• Pink

    New Build Out in a mall location. Scope included: Demo, layout, framing, drywall and finishing, painting and wall covering, graphics, finished carpentry, final clean up and much more.

  • Bath & Body Works

    New Build Out in a mall location. Scope included: Demo, layout, framing, drywall and finishing, painting and wall covering, graphics, finished carpentry, final clean up and much more.

  • Victoria’s Secret

    New Build Out in a mall location. Scope included: Demo, layout, framing, drywall and finishing, painting and wall covering, graphics, finished carpentry, final clean up and much more.

  • Everest

    New Construction in a existing Warehouse for a packaging center. This was a turn key project that featured scopes such as  trenching and footing, framing, parallam beams, drywall, finishing and painting of walls, electrical, plumbing, epoxy flooring and much more.

  • AMI

    Build out of a Restroom, Break room and locker room. Project included demo, layout, framing, drywall, painting, epoxy flooring, plumbing, installation of fixtures and more.

  • Pro Image

    New Build Out in a mall location. This was a turn key site that featured all in house scope such as, plumbing, framing, drywall, chem metal install on store front, wall finish, painting, t bar, finish carpentry, slat walls & installation of all fixtures.

  • Toms

    New Build Out in a outdoor strip mall. This was a turn key site that featured all in house scope such as plumbing, framing, drywall, electrical, HVAC, wall finish, painting, finish carpentry, and assembly & installation of fixtures.

  • Ulta

    New Build Out in a Retail Shopping Center, Scope included: Trenching, pourback, plumbing, framing, drywall, wall finish, painting, wall covering and plumbing finishes. 

  • Tacocina

    New Restaurant in a Retail Center. This was a turn key site that featured all in house scope such as: pluming, framing, drywall, electrical, HVAC, wall finish, painting, finish carpentry, flooring, assembly & installation of all fixtures.

  • Pali Mountain

    New Building for the New Mess Hall, Scope featured: framing, drywall painting, custom painting, custom stairs, wall finish, t bar installation, finish carpentry, canopy install, full kitchen build out and some assembly & installation of fixtures.